Dec '08 - Present
DESLI-zorg: PGB consultant / Zorg makelaar /
DESLI: Site (design) engineer - Web / Automation consultant

After a few years of study and training (on the job); the assistance, guidence and financials thru PGB (Persoons Gebonden Budget) for people in need, has become a major part of the daily work; the social service sector.
Doing full administrative work for both the caretaker as well as the caredemander.
Continue the study for web layout with CSS. Also SEO is a major part of the study.

Oct '08 - Dec '08
NAM Den Helder - Imtech
Site QC engineer

DESLI-zorg: PGB consultant / Zorg makelaar
Final Graphic check for the skada project where all NAM platforms were controlable from the CCR in Den Helder. This check enhanched both correct I/O on the graphic as well as the presentation of the process as per P&ID.

Jul '07 - Sept '08
DESLI: Site (design) engineer - Web / Automation consultant

DESLI-zorg: PGB consultant / Zorg makelaar
Continue the study for web layout with CSS.
Feasibility study for integration and participation of handicapped and unemployed people combined with practical training for students or those who re-enter the labor process.
Set-up Open Source Software systems for desktop computers and laptops using linux distribution Ubuntu. Working on promotional presentations for Open Office program targetting dedicated transfers from Microsoft Office.

Feb '07 - Jun '07
OACG logoAllseas logo ALLSEAS - OAC-Group
MC manager + QC engineer - both for E&I (at site)

DESLI-zorg: PGB consultant / Zorg makelaar
The OAC-group stands for Offshore Accommodation Contractors Group.
As part of the OAC-group team the task was to get the Mechanical Complete status for the accommodation on the Audacia according the planning.
The Audacia is a Pipe Laying Vessel; an Allseas project at site of Keppel-Verolme in Rozenburg yard.
Besides the meetings about performance and progress, the main job was to generate the inspection forms, with the installation drawings as a guidline, for each item as described in the MC-manual. I also stepped in for actual inspections with client and installation contractor.

Sept '06 - Jan '07
Gids logo DESLI
Site (design) engineer - Web consultant

DESLI-zorg: PGB consultant / Zorg makelaar
After the succesful implementation of the intranet and automated "Folderbeheer" of GIDS (see period 1999-2005) the question came to change the homepage of the website to an active page. Active in the respect that the personal is able to implement the latest news on there website, without delay and with photo.
The proposal of the new GIDS portal is realized with a database supported, PHP-driven homepage. The database is filled from a secured, webbased form that is filled out by the personal involved. Because of the reconstruction, simultaneous the colors and layout of the site were adjusted so it looks more fresh and healthier. The technical improvement of the site is done by means of CSS.
To compare: This is the still existing portal

Gasunie logo Cegelec logo Dec '05 - Aug '06
GASUNIE CSNH - CEGELEC MOERDIJK
QA/QC Engineer + Turnover manager  -  both for E&I (At site)

As part of the Project team my task was to guard quality in the 2nd line for equipment delivered and actual installation for electrical and instrumentation.
To determine the quality of installation I wrote workpackages, quality plans with hold/witness points, risk inventarisation & evaluation and created inspection sheets. Further more I performed the adminstration of these inspection sheets.
For the turnover I mainly was involved to ensure that the Vendor documents were according requirements (RED) of the requisition. Folders with a pre-defined index were assembled per vendor to hand over to the client.

Nov '99 - Nov 2005
DESLI
Site (design) engineer - Web consultant


One step further then just a web-based search tool in the Digital Information Center, a full maintainable database was designed, configured and implemented. The information about all kinds of psychological disabilities from folders, newspaper articles, etc. are stored in the Folderbeheer. Input, search parameter, searchresult, change data and remove record are some of the features of this application. Actual maintenance is accessible via username and password only.

From the userfriendly database of GGZ Delftland, a MS Access program, a web-based search tool was designed and configured with PHP scripting. The setup for the Linux server (third party), hosting and interfaces were provided. All as part of the Digital Information Center to be accessible for all personal without the use of expensive MS programs.
Additional to this search tool, the information centre was populated with the first digital instructions and documentation.

Designed and configured extreme userfriendly database with MS-Access for GGZ Delftland to be operated by basic computer oriënted persons. Input via multiple forms and output via cascading search options.

BP logo-link to related experience summary Configuration of the re-designed product transport system with additional storrage facilities due to the de-bottlenecking project of PTA-3 plant.

Calculation practices for the GA-calculation system used by UNETO electrical constructors

Basic PLC programming course for compact systems with MOELLER Sucosoft S40 according IEC 1131.

Selfstudy for the html language used by the WWW to create homepages/web-sites with the basics so all browsers can reproduce the intented.
References:   Web Design & Support ,   Coöp. Ver. DESIGN ENGINEERING SERVICE & LOGIC IMPLEMENT u.a. ,   home-page Jeroen ,   LITECAD vof ,   AANNEMER B.V. ,   BEWONERS COMMISSIE LvD ,   Primairy school - PCBO 'de ARK' ,  and  van der ENDE B.V. .

Selfstudy for the Siemens S7; from how to start a project, up to download.

Aug '98 - Oct '99
ESSO NORWAY - HONEYWELL NORWAY
Safety System Commissioning Engineer

Philosophy determination with client, Configuration, Construction supervision, Commissioning, Punchlist handling and Start-up of the Fire & Gas and the ESD Safety System, with related systems, for the ESSO JOTUN (WHP & FPSO) - On-shore and Off-shore.
MORE JOTUN

Jun '98 - Jul '98
DUPONT ROZENBURG - HONEYWELL ROTTERDAM
Instrument Control Engineer

Prepare, for the Dupont Nylon plant, a detailed, on-line change-over scenario from control panels to DCS for the instrumentation contractor.

Oct '97 - May '98
AMOCO GEEL BELGIË - ACB Construction Team
Dec '96 - Jun '97
AMOCO GEEL - HONEYWELL BRUSSEL (BELGIE)
Safeguarding System Engineer (At site)

Design safeguarding philosophy and control strategy with process and instrument department for new TA/PTA plant. Creating the full database for both the safeguarding systems and configure the HSMS FSC systems with FSCad.
Supply test applications and descriptions for the various parts of the plant and perform the tests with operations.
Assist during commissioning and start-up of the plant.

April '97 - July '97
HONEYWELL SAFETY MANAGEMENT SYSTEMS B.V 'sHERTOGENBOSCH
Systems engineer

Cause&Effect analyses, implementation and programming into PLC with FSCad. System configuration and compilation for ALP job.

Aug '96 -Nov '96
JOHN BROWN ENGINEERS & CONSTRUCTORS B.V. ZOETERMEER
Engineer instrumentation

Writing Instrument Requisitions, field survey and lead design for the de-bottlenecking project of SHELL Pernis CDPP plant. Preparing detailed construction description (Bouw opdracht) with construction supervisor.

April '96 - June '96
HONEYWELL SAFETY MANAGEMENT SYSTEMS B.V 'sHERTOGENBOSCH
Systems engineer

Cause&Effect analyses, implementation and programming into PLC with FSCad. System configuration and compilation for SAFEGUARDING job.

Jan '96 - Aug '96
RAYTHEON ENGINEERS & CONSTRUCTORS B.V. DEN HAAG
Engineer instrumentation - safeguarding - control

Writing Requisitions, do bid evaluations and clarifications with Vendors, for the Distributed Control System, the SafeGuarding System, the Vibration Monitoring System and the Flow Totalizers for custody transfer account in agreement with the project specifications involving the AIR LIQUIDE ROZENBURG project.
Set up configuration databases for the control systems DCS and SGS. Performing FAT and commissioning for safeguarding system.
Other project activities performed were purchasing assistance, drawing approval and attending meetings.

May '93 - Nov '95
COMPRIMO ENGINEERS & CONTRACTORS B.V. AMSTERDAM
Engineer instrumentation - safeguarding - control

Writing Instrument Safeguarding Narratives for a number of units involving the SHELL PER+ project.
Engineering functional logic diagrams to meet requirements as described in the safeguarding narratives and do the complete configuration for those logic diagrams in the FSC system of Pepperl+Fuchs (SMS). Performing FAT and SAT for completed safeguarding systems. Commissioning was performed for some units.
Preparing instrument requisitions and call-off orders in agreement with the Job Instruction Manual and umbrella contracts.
Preparing databases and LCD requests for DCS configuration.

Sept '92 - May '93
I.B.N. INGENIEURSBUREAU B.V. ROTTERDAM
Engineer instrumentation

Preparing all documents involving BDEP (Basic Design Engineering Package) and 10% estimate for SHELL Pernis Care & Maintain projects.

June '92 - Aug '92
AKZO SALT CHEMICAL BOTLEK B.V.
Calculator / preparer

Calculate and prepare field change packages made by engineering for maintenance purpose and the '93 stop project.

March '92 - May '92
GTI ROTTERDAM - CAPELLE
Engineer electrical

Engineering electrical utility lay-outs and switchboards from bid-drawings and new client specifications for the Casino-Plaza project.
Engineering security control panels and commissioning of electrical system.

Oct '91 - Dec '91
JOHN BROWN ENGINEERING B.V. ZOETERMEER
Engineer instrumentation

Engineering special loops and creating design masters on CAD for loop generation in behalf of a DSM-project.

July '88 - Oct '91
HONEYWELL B.V. AMSTERDAM
Project Engineer Industrial Process Control

Several SHELL Moerdijk (MLO-MEOD-MUB) and Pernis (Epikote/LERP/ CEP/LTI/LERX-CDPP-CEOD/COF3) projects in which the pneumatic control system was replaced by the TDC-3000 system or the TDC system was upgraded. Experience in basic HIWAY (MC-CB-PIU-EOS) as well as UCN (PM-300) and the LCN (US-HG-NIM-HM-AM) systems of Honeywell up to release 320. All project activities were performed such as purchasing, drawing control, acceptance tests, attending meetings, construction control and commissioning.

Feb '88 - June '88
COMPRIMO B.V. SCHIEDAM
Lead Design-Engineer Instrumentation/Electrical

Several ESSO projects:    - improvement sales gas
                                      - berth extension barge pier
                                      - berth extension pier 2
Total design package (E&I) for construction

ICI Melinex extension project 10537/03
Total design package (E&I) for rotary feeders, blowers, diverter valves and level control to PLC input including power supplies, panels and local control boxes.
April '87 - Oct '87
BADGER B.V. DEN HAAG
Lead Design-Engineer Instrumentation (On-Site)

Arco Belgium Project BN-4940
"As Built" for present situation and investigations for re-instrumentation to ICS system. Design packages for interim period, pump seal alarms and gas detection.
Jan '87 - March '87
GLOBAL ENGINEERING B.V. LEIDEN
Engineer Instrumentation

Placid Project: Modified Standard Wellhead Platform
Design logic schematics from 'Cause and Effect' drawings for standard production platform with additional dehydration and compression unit. Checking instrument cable routing and additional drawings.
March '86 - Sept '86
BADGER CHIYODA JV WHANGAREI NEW ZEALAND
Lead Designer Instrumentation (On-Site)

Redesign control diagrams and related wiring schedules according to re-engineered logics by construction team and operations.
Feb '86 - Feb '86
JOHN BROWN ENGINEERS & CONSTRUCTORS B.V. ZOETERMEER
Designer Instrumentation

Aramco project 84482
Co-design instrumentation loops for CAD.
Checking Foxboro vendor connection list for new control building Ras Tanura.
April '85 - Jan '86
TEBODIN B.V. DEN HAAG
Lead Designer Instrumentation

NAM project 12806
Design of instrumentation loops for renovation project "IJsselmonde" according to data sheets and P&ID's.
Design air piping details and process piping details according to NAM standards.
Sept '84 - Feb '85
BADGER B.V. DEN HAAG
Designer Instrumentation

NAM project BN-3741
Design of instrumentation drawings for King Size Cluster "De Pauwen" as there are loops, lay-outs, panels and cabinets according to data sheets air piping hook-ups and piping drawings.
Feb '84 - Aug '84
MATTHEW HALL KEYNES ENGINEERING B.V. SCHIEDAM
Lead Designer Instrumentation

Instrumentation interface from "Kooksfabriek" to Kogast computer; this related to new location in plant, also related loop diagram and distribution panels.
Nov '83 - Jan '84
JOHN BROWN ENGINEERS & CONSTRUCTORS B.V. ZOETERMEER
Designer Instrumentation

General Electric Project 83428
Design instrumentation interface to new provox computer, also related loop diagrams, cable lay-out and distribution cabinets.
Sept '83 - Oct '83
PROTECH ENGINEERING B.V. SCHIEDAM
Lead Designer Instrumentation

NAM Project 2965-023
Design of instrument cabling lay-out according to new piping drawings, also related loop diagrams and fire fighting for production platform "Ameland Westgat".
May '83 - June '83
MATTHEW HALL KEYNES ENGINEERING B.V. BREDA
Lead Designer Instrumentation

Hoechst Project 16834254
Redesign instrumentation interface to provox computer; this related in energy conservation in the steam plant, also related loop diagrams, cable lay-out and distribution cabinets.
Jan '83 - April '83
HONEYWELL B.V. AMSTERDAM
Lead Designer Instrumentation

NAM projects FP2403 and FP2418
Den Helder onshore and K-14 offshore.
Design of distribution cabinets for I.S. connection to TD-2000 system and also loop diagrams related to TDC-2000.
Jan '82 - Dec '82
MATTHEW HALL KEYNES ENGINEERING B.V. SCHIEDAM
Lead Designer Electrical / Instrumentation

BBC project 11825819
Complete checking for one of six power plants for the Indonesian Government (PLN).
Checking two complete MCC installations for Denmark's drilling rigs.
Shell project
Signal redesign for new SER computer.
Jan '81 - Dec '81
PROTECH ENGINEERING B.V. SCHIEDAM
Squadleader Electrical / Instrumentation

NAM Project 2781-023
Design of instrumentation and fire fighting lay-outs and loop diagrams for production platform "Ameland Westgat".
Oct '80 - Jan '81
ADVIESBURO KETEL & SCHEINDELEN B.V. DELFT
Lead Designer Electrical

Design of complete power and lighting installation for Townhall Lelystad and Warehouse ASPA according to NEN 1010.
April '80 - Sept '80
GUSTO ENGINEERING B.V. SCHIEDAM
Designer Electrical

Design of circuit diagrams for jack-up rigs according Gusto-leg-specs in association with hydraulic equipment.
Sept '79 - March '80
BATENBURG B.V. ROTTERDAM
Designer Electrical

Design of instrumentation and electrical single lines, cable lay-out for water cleaning factory in Andijk (NH). Design blind schedules from P&ID for control rooms.
Oct '77 - Aug '79
MKSAC - MORRISON KNUDSEN SAUDI ARABIA CONSORTSIUM DELFT
Designer Electrical

Implement electrical installations into frefab concrete elements and design details with construction department of HBG.
Dec '76 - Sept '77
KONING & HARTMAN DEN HAAG
Designer electrical

Designing Printed Circuit Boards from sketches and design production drawings.
START PAGE of this document