Expierence  of  M.J.A. Rust

(from 1988 up to now)
Dec '08 - Present

DESLI

Site (design) engineer - Web / Automation consultant

Study for web layout with CSS.

Oct '08 - Dec '08

NAM Den Helder - Imtech

Site QC engineer

Final Graphic check for the skada project where all NAM platforms were controlable from the CCR in Den Helder. This check enhanched both correct I/O on the graphic as well as the presentation of the process as per P&ID.

Jul '07 - Sept '08

DESLI

Site (design) engineer - Web / Automation consultant

Study for web layout with CSS.
Feasibility study for integration and participation of handicapped and unemployed people combined with practical training for students or those who re-enter the labor process.
Set-up Open Source Software systems for desktop computers and laptops using linux distribution Ubuntu. Working on promotional presentations for Open Office program targetting dedicated transfers from Microsoft Office.

Feb '07 - Jun '07

ALLSEAS - OAC-Group

MC manager + QC engineer - both for E&I (at site)

The OAC-group stands for Offshore Accommodation Contractors Group.
As part of the OAC-group team the task was to get the Mechanical Complete status for the accommodation on the Audacia according the planning.
The Audacia is a Pipe Laying Vessel; an Allseas project at site of Keppel-Verolme in Rozenburg yard.
Besides the meetings about performance and progress, the main job was to generate the inspection forms, with the installation drawings as a guidline, for each item as described in the MC-manual. I also stepped in for actual inspections with client and installation contractor.

Sept '06 - Jan '07

DESLI

Site (design) engineer - Web consultant

After the succesful implementation of the intranet and automated "Folderbeheer" of GIDS (see period 1999-2005) the question came to change the homepage of the website to an active page. Active in the respect that the personal is able to implement the latest news on there website, without delay and with photo.
The proposal of the new GIDS portal is realized with a database supported, PHP-driven homepage. The database is filled from a secured, webbased form that is filled out by the personal involved. Because of the reconstruction, simultaneous the colors and layout of the site were adjusted so it looks more fresh and healthier. The technical improvement of the site is done by means of CSS.
To compare: This is the still existing portal

Dec '05 - Aug '06

GASUNIE CSNH - CEGELEC MOERDIJK

QA/QC Engineer + Turnover manager  -  both for E&I (At site)

As part of the Project team my task was to guard quality in the 2nd line for equipment delivered and actual installation for electrical and instrumentation.
To determine the quality or installation I wrote workpackages, quality plans with hold/witness points, risk inventarisation & evaluation and created inspectionsheets. Further more I performed the adminstration of these sheets.
For the turnover I mainly was involved to ensure that the Vendor documents were according requirements (RED) of the requisition. Folders with a pre-defined index were assembled per vendor to hand over to the client.

Nov '99 - Nov 2005

DESLI

Site (design) engineer

Aug '98 - Oct '99

ESSO NORWAY - HONEYWELL NORWAY

Safety System Commissioning Engineer

Philosophy determination with client, Configuration, Construction supervision, Commissioning, Punchlist handling and Start-up of the Fire & Gas and the ESD Safety System, with related systems, for the ESSO JOTUN (WHP & FPSO) - On-shore and Off-shore.

Jun '98 - Jul '98

DUPONT ROZENBURG - HONEYWELL ROTTERDAM

Instrument Control Engineer

Prepare, for the Dupont Nylon plant, a detailed, on-line change-over scenario from control panels to DCS for the instrumentation contractor.

Oct '97 - May '98

AMOCO GEEL BELGIË - ACB Construction Team

Dec '96 - Jun '97

AMOCO GEEL - HONEYWELL BRUSSEL (BELGIE)

Safeguarding System Engineer (At site)

Design safeguarding philosophy and control strategy with process and instrument department for new TA/PTA plant. Creating the full database for both the safeguarding systems and configure the HSMS FSC systems with FSCad.
Supply test applications and descriptions for the various parts of the plant and perform the tests with operations.
Assist during commissioning and start-up of the plant.

April '97 - July '97

HONEYWELL SAFETY MANAGEMENT SYSTEMS B.V 'sHERTOGENBOSCH

Systems engineer

Cause&Effect analyses, implementation and programming into PLC with FSCad. System configuration and compilation for ALP job.

Aug '96 -Nov '96

JOHN BROWN ENGINEERS & CONSTRUCTORS B.V. ZOETERMEER

Engineer instrumentation

Writing Instrument Requisitions, field survey and lead design for the de-bottlenecking project of SHELL Pernis CDPP plant. Preparing detailed construction description (Bouw opdracht) with construction supervisor.

April '96 - June '96

HONEYWELL SAFETY MANAGEMENT SYSTEMS B.V 'sHERTOGENBOSCH

Systems engineer

Cause&Effect analyses, implementation and programming into PLC with FSCad. System configuration and compilation for SAFEGUARDING job.

Jan '96 - Aug '96

RATHEON ENGINEERS & CONSTRUCTORS B.V. DEN HAAG

Engineer instrumentation - safeguarding - control

Writing Requisitions, do bid evaluations and clarifications with Vendors, for the Distributed Control System, the SafeGuarding System, the Vibration Monitoring System and the Flow Totalizers for custody transfer account in agreement with the project specifications involving the AIR LIQUIDE ROZENBURG project.
Set up configuration databases for the control systems DCS and SGS. Performing FAT and commissioning for safeguarding system.
Other project activities performed were purchasing assistance, drawing approval and attending meetings.

May '93 - Nov '95

COMPRIMO ENGINEERS & CONTRACTORS B.V. AMSTERDAM

Engineer instrumentation - safeguarding - control

Writing Instrument Safeguarding Narratives for a number of units involving the SHELL PER+ project.
Engineering functional logic diagrams to meet requirements as described in the safeguarding narratives and do the complete configuration for those logic diagrams in the FSC system of Pepperl+Fuchs (SMS). Performing FAT and SAT for completed safeguarding systems. Commissioning was performed for some units.
Preparing instrument requisitions and call-off orders in agreement with the Job Instruction Manual and umbrella contracts.
Preparing databases and LCD requests for DCS configuration.

Sept '92 - May '93

I.B.N. INGENIEURSBUREAU B.V. ROTTERDAM

Engineer instrumentation

Preparing all documents involving BDEP (Basic Design Engineering Package) and 10% estimate for SHELL Pernis Care & Maintain projects.

June '92 - Aug '92

AKZO SALT CHEMICAL BOTLEK B.V.

Calculator / preparer

Calculate and prepare field change packages made by engineering for maintenance purpose and the '93 stop project.

March '92 - May '92

GTI ROTTERDAM - CAPELLE

Engineer electrical

Engineering electrical utility lay-outs and switchboards from bid-drawings and new client specifications for the Casino-Plaza project.
Engineering security control panels and commissioning of electrical system.

Oct '91 - Dec '91

JOHN BROWN ENGINEERING B.V. ZOETERMEER

Engineer instrumentation

Engineering special loops and creating design masters on CAD for loop generation in behalf of a DSM-project.

July '88 - Oct '91

HONEYWELL B.V. AMSTERDAM

Project Engineer Industrial Process Control

Several SHELL Moerdijk (MLO-MEOD-MUB) and Pernis (Epikote/LERP/ CEP/LTI/LERX-CDPP-CEOD/COF3) projects in which the pneumatic control system was replaced by the TDC-3000 system or the TDC system was upgraded. Experience in basic HIWAY (MC-CB-PIU-EOS) as well as UCN (PM-300) and the LCN (US-HG-NIM-HM-AM) systems of Honeywell up to release 320. All project activities were performed such as purchasing, drawing control, acceptance tests, attending meetings, construction control and commissioning.


Earlier work experiences for MJA Rust Original Startpage for this site