Expierence  of  M.J.A. Rust

(up to 1988)
Feb '88 - June '88

COMPRIMO B.V. SCHIEDAM

Lead Design-Engineer Instrumentation/Electrical

Several ESSO projects:    - improvement sales gas
                                     - berth extension barge pier
                                     - berth extension pier 2
Total design package (E&I) for construction

ICI Melinex extension project 10537/03
Total design package (E&I) for rotary feeders, blowers, diverter valves and level control to PLC input including power supplies, panels and local control boxes.

April '87 - Oct '87

BADGER B.V. DEN HAAG

Lead Design-Engineer Instrumentation (On-Site)

Arco Belgium Project BN-4940
"As Built" for present situation and investigations for re-instrumentation to ICS system. Design packages for interim period, pump seal alarms and gas detection.

Jan '87 - March '87

GLOBAL ENGINEERING B.V. LEIDEN

Engineer Instrumentation

Placid Project: Modified Standard Wellhead Platform
Design logic schematics from 'Cause and Effect' drawings for standard production platform with additional dehydration and compression unit. Checking instrument cable routing and additional drawings.

March '86 - Sept '86

BADGER CHIYODA JV WHANGAREI NEW ZEALAND

Lead Designer Instrumentation (On-Site)

Redesign control diagrams and related wiring schedules according to re-engineered logics by construction team and operations.

Feb '86 - Feb '86

JOHN BROWN ENGINEERS & CONSTRUCTORS B.V. ZOETERMEER

Designer Instrumentation

Aramco project 84482
Co-design instrumentation loops for CAD.
Checking Foxboro vendor connection list for new control building Ras Tanura.

April '85 - Jan '86

TEBODIN B.V. DEN HAAG

Lead Designer Instrumentation

NAM project 12806
Design of instrumentation loops for renovation project "IJsselmonde" according to data sheets and P&ID's.
Design air piping details and process piping details according to NAM standards.

Sept '84 - Feb '85

BADGER B.V. DEN HAAG

Designer Instrumentation

NAM project BN-3741
Design of instrumentation drawings for King Size Cluster "De Pauwen" as there are loops, lay-outs, panels and cabinets according to data sheets air piping hook-ups and piping drawings.

Feb '84 - Aug '84

MATTHEW HALL KEYNES ENGINEERING B.V. SCHIEDAM

Lead Designer Instrumentation

Instrumentation interface from "Kooksfabriek" to Kogast computer; this related to new location in plant, also related loop diagram and distribution panels.

Nov '83 - Jan '84

JOHN BROWN ENGINEERS & CONSTRUCTORS B.V. ZOETERMEER

Designer Instrumentation

General Electric Project 83428
Design instrumentation interface to new provox computer, also related loop diagrams, cable lay-out and distribution cabinets.

Sept '83 - Oct '83

PROTECH ENGINEERING B.V. SCHIEDAM

Lead Designer Instrumentation

NAM Project 2965-023
Design of instrument cabling lay-out according to new piping drawings, also related loop diagrams and fire fighting for production platform "Ameland Westgat".

May '83 - June '83

MATTHEW HALL KEYNES ENGINEERING B.V. BREDA

Lead Designer Instrumentation

Hoechst Project 16834254
Redesign instrumentation interface to provox computer; this related in energy conservation in the steam plant, also related loop diagrams, cable lay-out and distribution cabinets.

Jan '83 - April '83

HONEYWELL B.V. AMSTERDAM

Lead Designer Instrumentation

NAM projects FP2403 and FP2418
Den Helder onshore and K-14 offshore.
Design of distribution cabinets for I.S. connection to TD-2000 system and also loop diagrams related to TDC-2000.

Jan '82 - Dec '82

MATTHEW HALL KEYNES ENGINEERING B.V. SCHIEDAM

Lead Designer Electrical / Instrumentation

BBC project 11825819
Complete checking for one of six power plants for the Indonesian Government (PLN).
Checking two complete MCC installations for Denmark's drilling rigs.
Shell project
Signal redesign for new SER computer.

Jan '81 - Dec '81

PROTECH ENGINEERING B.V. SCHIEDAM

Squadleader Electrical / Instrumentation

NAM Project 2781-023
Design of instrumentation and fire fighting lay-outs and loop diagrams for production platform "Ameland Westgat".

Oct '80 - Jan '81

ADVIESBURO KETEL & SCHEINDELEN B.V. DELFT

Lead Designer Electrical

Design of complete power and lighting installation for Townhall Lelystad and Warehouse ASPA according to NEN 1010.

April '80 - Sept '80

GUSTO ENGINEERING B.V. SCHIEDAM

Designer Electrical

Design of circuit diagrams for jack-up rigs according Gusto-leg-specs in association with hydraulic equipment.

Sept '79 - March '80

BATENBURG B.V. ROTTERDAM

Designer Electrical

Design of instrumentation and electrical single lines, cable lay-out for water cleaning factory in Andijk (NH). Design blind schedules from P&ID for control rooms.

Oct '77 - Aug '79

MKSAC - MORRISON KNUDSEN SAUDI ARABIA CONSORTSIUM DELFT

Designer Electrical

Implement electrical installations into frefab concrete elements and design details with construction department of HBG.

Dec '76 - Sept '77

KONING & HARTMAN DEN HAAG

Designer electrical

Designing Printed Circuit Boards from sketches and design production drawings.


Original Startpage for this site More work experiences for MJA Rust